FROM THE PRODUCTION FLOOR
Factory Director's Diary
Entries written by our factory director about production, testing and shipping at our factory in Chongqing.
Factory Director's Diary
- Frame-fit gauge check on J10 — what a sample must pass before release — Before a J10 sample clears the JIAJINGCAT (AutoWipeBot) fit-check bay, we run the stated gauge procedure and confirm the edge path against the frame rail — and we hold the unit if the sample does not meet that check.
- UPS and safety-tether check on J10 samples — what we verify before ship — Before a J10 sample leaves the JIAJINGCAT (AutoWipeBot) line for ship or partner review, we run a UPS backup functional check and confirm the safety tether attaches and holds as specified — and we hold the unit if either check fails.
- Incoming IQC for J10 housings — what we measure before line start — Before a J10 housing lot enters the line at JIAJINGCAT (AutoWipeBot), we measure fit, seal face, and finish against the drawing — and we stop the run if the lot fails those checks, even when shipping pressure is high.